| Back |
|
Excavation For A Superior Walls Basement |
|||
|
|
Confirm that you are working from the final approved drawing prior to digging |
|
A 2' overdig on the outside of the footprint is needed to enable the proper & efficient placement of your basement |
|
|
Ensure compliance with all local codes & OSHA regulations while excavating |
|
Slope Grade at a minimum of 6" fall within the first 10' to divert ground water from foundation area |
|
Please consult with your Superior Walls sales representative for specific details concerning the excavation of your building site |
|||